Storage Facility Environmental Assessment Worksheet Project Details Apex staff prepared an environmental assessment worksheet (EAW) for a large storage facility in Brainerd, Minnesota, adjacent to Hartley Lake. The Minnesota Environmental Policy Act requires analysis of specific projects to inform the public about the project and to help identify ways to protect the environment. The EAW is […]

USDA
Rural Utilities Service
Environmental Report

USDA Rural Utilities Service Environmental Report Project Details ReadiTech Engineering partnered with Apex to complete an Environmental Report for Categorical Exclusions for the USDA Rural Utilities Service (RUS) to install 325 miles of new underground fiber optic cable in North Dakota and Montana. The project received funding through RUS’ ReConnect III program. Several challenges arose […]

NDDOT and City of Fargo, ND
Main Avenue Reconstruction
25th Street to University Drive

City of Fargo Main Avenue Reconstruction 25th Street to University Drive Previous Next Project Details Apex was selected by the NDDOT, along with our partner SRF, to complete the design and permitting of the reconstruction of Main Avenue from 25th Street to University Drive in Fargo. The project initially began as a CATEX, but as […]

NDDOT and Burleigh County, ND
66th Street SE Overpass
Northgate Dr to Apple Creek Rd

Burleigh County 66th Street SE Overpass Northgate Drive to Apple Creek Road Previous Next Project Details The Apex Environmental Group completed the NDDOT’s Programmatic Biological Assessment for the approximately 160-acre study area of this ND 14 project. This included a field survey for northern long-eared bat habitat and a Dakota skipper habitat survey following the […]

NDDOT
ND 14 – South of Jct 200

NDDOT – ND 14 South of Jct 200 Project Details This project consisted of new construction or reconstruction of the roadway through several basins to raise the grade of the road above water levels. The Apex environmental team worked on the following items for this project: Programmatic Categorical Exclusion Programmatic Biological Assessment USACE Section 404 […]

NDDOT
US 85 – ND 200 to Long X Bridge

NDDOT – US 85 ND 200 to Long X Bridge Project Details This project consists of expanding 20 miles of US 85 to a four-lane highway from the ND 200 intersection to Long X Bridge. The scope of work includes preliminary survey, earthwork, culvert installation and extensions, asphalt pavement, geotechnical analysis for landslide mitigation, right-of-way […]

NDDOT
ND 49 – State Line to Jct ND 21

NDDOT – ND 49 State Line to Jct ND 21 Previous Next Project Details The NDDOT is proposing structural improvements along ND 49 from the State Line north to the junction of ND 21 in Sioux and Grant Counties, North Dakota. The project consists of cement stabilized full-depth reclamation with new hot bituminous pavement, subcuts […]