Apex Logo_color

Bottineau County
Water Resource District
Westhope Dam Design

Bottineau County WRD Design of Westhope Dam Previous Next Project Details Due to recent dam failure, Bottineau County Water Resource District retained the services of Apex Engineering to provide a hydrologic and hydraulic analysis of Westhope County Club Dam to verify the dam was adequately designed. The dam (Water Permit Number 04138) is classified as […]

Bottineau County
Water Resource District
Drain Reconstruction

Baumann Drain Reconstruction Bottineau County WRD Previous Next Project Details The Bottineau County Water Resource District (BCWRD) and a local steering committee began working on the redevelopment and improvement of a drain, known locally as Baumann Drain, just north of Westhope, ND. Baumann Drain was designed by the Soil Conservation Services (SCS) and constructed in […]

Wells County
Water Resource District
New Hurdsfield Drain

Wells County WRD New Hurdsfield Drain Previous Next Project Details Over the last few decades, an increase in the water levels in Hurdsfield and East Lake, located near Chaseley, ND, has had a negative effect on the surrounding area. The lake levels have been increasing, flooding agricultural and residential land. These lakes have significantly increased […]

ND Department of Transportation
Retention Pond Remediation

Retention Pond Remediation Project Details As growth from oil production impacted communities in western North Dakota, infrastructure improvements also grew. Located within the heart of oil country, Watford City has seen significant growth and its footprint expanded. New challenges faced the community, one of which was the drainage basin at the intersection of North Dakota […]

ND State Water Commission
Queen City Dam
Hydrology Study

Queen City Dam Hydrology Study Project Details The North Dakota State Water Commission retained the services of Apex Engineering in May of 2016 to study the hydrology of Queen City Dam. Queen City Dam was classified as a high-hazard dam owned and maintained by the City of Dickinson. The purpose of the project was to […]

City of Bismarck
Stormwater Management
Plan Review

Stormwater Management Plan Review Previous Next Project Details The City of Bismarck retained Apex Engineering Group in 2013 to assist in the review of Storm Water Management Plans for both plats and site plans. Bismarck had been experiencing rapid growth and the city was too short-staffed to keep up with the number of reviews required. […]

Burleigh County
Tavis Road
Flood Control Project

Tavis Road Flood Control Project Project Details Following the 2011 flood event, Burleigh County identified the Tavis Road causeway as the location for the alignment of future permanent flood protection. Burleigh County, ND retained Apex to provide the engineering services to accomplish flood mitigation and prevention due to intimate involvement in previous flood events. The […]

South Bismarck Watershed​ Stormwater Model

South Bismarck WatershedStormwater Model Project Details​ The City of Bismarck retained Apex to update the South Bismarck watershed stormwater model. Apex completed the stormwater model update and Preliminary Engineering Report, which provides a hydraulic backbone of the system, methodology, and the basis for analyzing drainage within the watershed. The watershed modeling project was completed in […]